Bathroom Remodels in Northern Colorado

Full bathroom renovations from demo to final fixture. We manage every step so you don't have to coordinate five different contractors.

KohlerDeltaAmerican Standard

What's Included

Walk-In Shower Conversion

Remove a tub, reframe the opening, waterproof the pan, and install a custom walk-in shower. We handle tile selection guidance, shower pan installation, glass door rough-in, and fixture mounting. Full plumbing re-route if required.

Shower Pan & Waterproofing

Correct waterproofing is the most critical part of any shower remodel — and the most commonly skipped. We use industry-standard liner systems and tile over a properly sloped, waterproofed pan.

Tile Work — Floors, Walls & Surrounds

Full tile installation including substrate prep, backer board, thinset layout, tile setting, and grouting. Consistent grout lines, level planes, and durable results that look right for years.

Vanity, Toilet & Fixture Upgrades

New vanity installation including counter, sink, faucet, and drain. Toilet replacement with updated shutoff valve and supply line. All fixture work permitted and inspected where required.

Full Plumbing Re-Route

Many remodels require moving drain lines or supply stubs. We handle full plumbing re-routes in-house — no subcontractor delays. All work is pressure-tested before walls are closed.

Drywall & Paint After Completion

We patch, skim, and paint all surfaces affected during the remodel. You get a finished bathroom — not a half-done job that leaves you coordinating a separate painter.

Our Process

1

In-Home Consultation

We walk the bathroom with you, understand your goals and budget, and give you a detailed written scope and quote. No vague estimates.

2

Material Selection

We guide you through fixture and tile choices that fit your budget. You purchase materials from suppliers of your choice; we provide exact specs.

3

Demo & Installation

Most full bathroom remodels take 5–10 business days. We protect adjacent areas, demo carefully, and work clean throughout.

4

Final Walkthrough

We walk through every detail with you before considering the job complete. Any touch-up items are addressed before final payment.

Frequently Asked Questions

How long does a full bathroom remodel take?+

Most full bathroom remodels take 5–10 business days depending on scope. A shower conversion without full tile work can often be done in 3–4 days.

Do I need to buy my own tile and fixtures?+

Yes — we give you exact specs and can recommend suppliers, but you purchase materials. This keeps costs transparent and lets you control your budget.

Do you handle the permit?+

Yes. For jobs that require a permit (most full remodels do), we pull the permit and coordinate the inspection. This is included in our quote.

Can you work around an existing layout to keep costs down?+

Absolutely. Keeping existing drain and supply locations is the biggest cost-saver in a remodel. We'll tell you honestly what's possible within your budget.

Book Bathroom Remodels Today

In A Pinch Home Services LLC · Berthoud, CO · Licensed, Bonded & Insured

(970) 430-8433